22TCN 244-98 PDF

Consolidated water from buffering sand layer through vertical filtering layer need to be drained quickly out of the area adjacent sub-grade. Distribution scope of soft soil areas regarding distribution area. Trung Luong — My Thuan Expressway Stage 1 — Implementing project Testing for determination of physio-mechanical properties of embankment soil and sand is carried out in accordance with equivalent standards mentioned in Article III. In two ways of determination of pre-consolidation pressure value. If the calculation results satisfy the requirements in Article II. Th — Time by transverse direction: If adopting embankment method divided into many times.

Author:Dilabar Kagagal
Country:Saint Kitts and Nevis
Language:English (Spanish)
Genre:Spiritual
Published (Last):22 June 2005
Pages:259
PDF File Size:10.18 Mb
ePub File Size:15.3 Mb
ISBN:643-9-59218-777-1
Downloads:94580
Price:Free* [*Free Regsitration Required]
Uploader:Arajas



Gushura Requirements and specifications for settlement calculation II. Determination of stress at 22txn The rods are made by steel. In case of arranging the instruments in soft soil. Embankment materials shall be good water-reserving ones such as sand.

Trung Luong — My Thuan Expressway Stage 1 — Implementing project Consolidated water from buffering sand layer through filtering layer need to be drained quickly out of the area adjacent sub-grade. Berm width on each side should exceed scope of the most dangerous displacement curve from m the most dangerous displacement curve shall be calculated in accordance with the method described in V.

All the piles are required strongly driving in the soft soil. G — Weight of one the heaviest one. It is advised to use sand piles with mm diameter arranged alternatively with the interval equally to folds of sand pile diameter.

For soft soil layers are located under underground water levels. Such method is an option that gains significant economic and technical efficiency. When applying treatment method for embankment on soft soil that requires controlling embanking speed. Design standards on human-made lighting on 22tc, street, urban square.

Abac to determine horizontal consolidation Uh by Th and n. With Su calculated according to V Calculation of stability and its correlative parameter V. Testing data at site carried out by penetration or vane shear equipment is also processed towards calculation value mentioned in Article III.

Page 24 of Vertical consolidated drainage method is normally adopted when soft soil layer is thick its thickness is excessive to width of embankment bottom and embankment ground is high. On sandy mud or fine sandy mud area normally. Vehicle loads is considered as loads of maximum weight of vehicles that fully park at the same time in every 1m of highway length formula II Dimension of number used in the Figure is stated in m. To be base for proposal of design alternatives. Thickness of buffering sand layer at least shall be equal to the total settlement S stated in II.

The system shall be arranged in accordance with the following regulations: For convenience of implementation of direct embankment on soft soil good conditions for traffic on soft soil and firm compaction of the first layer. If extra soft soil area is discovered. D30 — grain size. Rods and casing should be done by each section of cm for the convenience of connection to embankment height. For each proposed alternative. D10 — grain diameter. If soft soil layer including soil layers with different Ch.

To check elevation at the time of arranging settlement instruments and to measure settlement once a day in embanking and pre-loading. Sand used in sand piles shall satisfy the requirements defined in IV. Requirements on topographical survey III. Buffering sand layer shall be arranged between soft soil layer and embankment in order to increase consolidation drainage capacity under the soft soil layer upwards natural ground by effect of embankment capacity.

Page 35 of In this specification, the soft ground determined in Section I. On grade I peat or soft and viscous soil area with peat thickness of less than m. Therefore, unless we do apply any measures, embankment on the soft ground shall lead to unstable wholly and deep settlement, the long duration settlement affects to the pavement, works on pavement and adjacent abutments.

Requirements on monitoring of settlement forecast Besides forecast of settlement calculation mentioned in Article II. Embankment of berm IV. Draw a bisector of an angle between the above horizontal line and tangential line through A.

Geological exploratory works is carried out by boreholes which each borehole are normally arranged from 50m to m to each other in centerline including boreholes in the first stage.

If the soil is soft and thin. Uv — Vertical consolidation is determined as mentioned in Article VI. Testing for determination of physio-mechanical properties of embankment soil and sand is carried out in accordance with equivalent standards mentioned in Article III. Related Posts

EL CAMINO A LA REALIDAD ROGER PENROSE PDF

22TCN 244-98 PDF

Gushura Requirements and specifications for settlement calculation II. Determination of stress at 22txn The rods are made by steel. In case of arranging the instruments in soft soil. Embankment materials shall be good water-reserving ones such as sand.

GANESHA ASHTAKAM IN PDF

Tiêu chuẩn ngành 22TCN244:1998

Fenritaur Kc — Depending on earthquake level as in Table II Page 30 of Determination of stress at M2 for calculating stress due to berm block at central point of the embankment at the depth z: Settlement monitoring regulations shall be stipulated in design: Its compaction density is required to obtain 0. L — Length of PBDs m. Observation time for the trial work should be from months. Requirements on stability Page 2 of 40 22 TCN — Embankment on soft soil should be stable, undamaged due to changes in the construction of tcn embankment is carried out in accordance with design or carried out with elevation over the one in design for pre-loading and in operation 22tccn. Sc VI-4 with meaning and determination of m is as same as in VI.

HARRISON PRINCIPI DI MEDICINA INTERNA 18 PDF

Gugor Calculated by Bishop Method. D10 — grain diameter. Depending on testing result of drawing compression curve e — lgp Figure 1. Condition checking IV-5a Page 38 of Page 24 of Every section in embankment on soft soil is differently calculated and designed.

Related Articles